Water resource system of Boroo Gold LLC

Within the framework of expansion and renovation of Boroo Gold LLC's main industrial water supply line, construction of external water supply network, facility BNbD 40-02-16, water supply, sewerage network, and facility BNbD3.05.04-90 are planned following norms and rules. In 2020, within one year, construction design was planned, the plant's water supply network has been completely renovated, and the installation work has been completed increasing production productivity and economic efficiency, financing the project at its own expense.

The 2300-meter-long section of the main water supply line was replaced with DICL (DUCT PIPE) D300 diameter high-pressure resistant, soft cast iron lasting 50-100 years. To save time needed to bring the materials, we worked with the top 3 manufacturers in the world within the framework of official business relations and partnerships. Professional team of international transportation and logistics procured inventory promptly. The project was successfully implemented by a team of foreign experts, Mongolian consulting engineers, who carried out the installation work in accordance with the manufacturer's instructions and the requirements of international standards.

CALL
+976 75002552

E-MAIL
info@hexagon-eng.com

VISIT
Mongolia, Ulaanbaatar, Sukhbaatar district, 1st khoroo, Peace Avenue, Blue Sky Tower

COPYRIGHT © 2021 Hexagon build engineering LLC. Designed by Brandarte LLC